Site Evaluation for On-lot Septic Systems

This article describes soil evaluations required in Pennsylvania before an appropriate septic system can be selected, designed, and installed.
Updated:
October 27, 2026

If you cannot connect to a public sewer system, all wastewater from your home or building must be directed to an on-lot sewage system for treatment and disposal. As shown in Figure 1, an on-lot sewage system consists of a treatment tank (most frequently referred to as a septic tank). The septic tank is a watertight container designed to allow the solids to settle to the bottom and lighter materials to float to the top. This separation process creates a clarified liquid layer in the middle of the tank and a sludge layer at the bottom that should be pumped out regularly. An absorption area or drainfield is another key component of a septic system. It contains several pipes to distribute the clarified liquid from the septic tank (also known as septic effluent) into the soil treatment area, or drainfield, which provides additional treatment as effluent percolates through the soil. This two-stage, solids-liquid treatment system is an effective, low-maintenance system designed to properly treat your wastewater and protect local surface and groundwater from contamination.

On-lot septic system showing septic system components including the septic tank, absorption area and an insert showing a cross-section of a drainfield showing a perforated distribution pipe, sitting between one to three feet of aggregate material and suitable soil layer of at least four feet where effluent filtration happens. There is a limiting zone of groundwater table underneath the suitable soil layer
Figure 1: On-lot septic system with a septic tank and trench absorption area. The insert illustrates wastewater movement through the soil beneath the absorption area.

Before anyone installs a septic system, Pennsylvania regulations require that residents work with the local Municipal Sewage Enforcement Officer (SEO) to have the property evaluated to determine whether the soil and site conditions are suitable for a drainfield. The SEO uses the findings of the site evaluation to determine whether the property qualifies for a conventional drainfield such as standard trenches or seepage beds. If the property has challenging site conditions that may not effectively treat septic effluent or the site does not meet the minimum requirements for conventional drainfields, alternative drainfields, such as elevated sand mounds, subsurface sand filters, drip irrigation systems, among other alternate technologies, may be recommended.

Following the site evaluation and the recommendation of a drainfield type, the design flow for the system, which is how much wastewater the home will generate, is determined based on the number of bedrooms in the home. The design flow will dictate the size of the septic tank and the drainfield. Together, this information is used to design a septic system that will handle the home's wastewater load and a drainfield that will effectively treat septic tank effluent. The septic permit is issued after the design is approved, after which installation can begin.

Drainfield construction standards in Pennsylvania

The drainfield and the soil beneath it are the final treatment system and the last barrier between household wastewater and groundwater. It can only perform as well as the soil and site conditions allow. That's why the drainfield receives so much attention during testing and permitting.

Under Pennsylvania code, a conventional drainfield is only approved when there is a minimum of 4 feet (48 inches) of suitable soil separating the bottom of the gravel aggregate layer of the drainfield from a limiting zone. The limiting zone is a restrictive layer that prevents movement and treatment of wastewater, such as the groundwater table or bedrock. Suitable soil is unsaturated (i.e., not soaked in water) and well-drained, allowing wastewater to move through the soil particles at a rate that is neither too fast nor too slow. As wastewater moves downward into the suitable soil layer, the soil acts as a filter, trapping particles and organic matter in the septic effluent. Additionally, the effluent comes into contact with naturally occurring bacteria in soil, which further break down pollutants in wastewater. Some minerals in the soil can also react with chemicals in wastewater to help break them down. These processes naturally provide additional wastewater treatment before effluent eventually reaches and mixes with groundwater. Although the minimum requirement is 4 feet, greater depth of suitable, unsaturated soil provides more natural treatment of septic effluent and is typically more favorable for septic system installation.

When the suitable soil on a property does not meet regulatory guidelines or site conditions are not conducive to a conventional drainfield, an alternative system is installed. These alternative drainfields incorporate additional treatment steps or engineered materials in the drainfield to ensure wastewater is adequately treated. For example, as stated in the on-lot alternate technology systems, these special cases require an additional pre-treatment unit to improve the quality of wastewater, such as a sand or peat filter, or an aerated geotextile unit between the treatment tank and where the effluent enters the soil to ensure that septic effluent is treated to a greater degree before discharge to the drainfield. In a few alternate systems, disinfection of the effluent may also be required.

What is site evaluation and why is it done?

A site evaluation is an assessment of the soil and landscape conditions on a property to determine whether it is suitable for a septic system drainfield and, if so, what type of system should be installed. Site evaluations are conducted by the SEO and/or a Certified Professional Soil Scientist before a septic system is designed, permitted, or installed. The goals include:

  • To determine how well the soil can absorb wastewater.
  • To establish how rapidly wastewater moves through the soil profile.
  • To identify limiting conditions such as shallow bedrock, seasonal high groundwater table, or restrictive soil layers
  • To establish that the septic system components would meet state and local regulations on isolation distances for protecting existing water infrastructure like private water systems, surface water sources, among others.

Although site evaluations are more common for new homes and septic installations, they may be needed for a property with an existing septic system when there is a question about whether the site can continue to support the current system. The first scenario is if the existing drainfield fails or the system must be replaced; the site may need to be reevaluated to determine whether the original location is still suitable or whether a new design is required. Because septic systems are sized based on the home's design flow (often tied to the number of bedrooms), adding bedrooms may require a new evaluation to determine whether the existing system is large enough to handle the increased wastewater volume.

The two main soil evaluations conducted are the probe test and the water movement test.

The probe

The first soil evaluation is known as the deep probe, probe, or test pit. It is done after a general site survey to determine where the absorption area should be located. The purpose of the probe is for the SEO or a Certified Professional Soil Scientist to evaluate the soil profile and locate the limiting zone. According to the Pennsylvania Code 25 PA. Code § 73.14 for site investigation, the probe consists of digging at least one excavation to examine the soil profile within 10 feet of the proposed location of the absorption area/drain field. The probe pits are dug to a maximum depth of 7 feet or to the top of the limiting zone. These pits should also be wide enough to allow the SEO or soil scientist to walk into the probe, look at the side walls, evaluate the soil, and identify the limiting zone.  The limiting zone is defined as the upper limit of any zone or soil layer that is expected to limit the soil's ability to treat wastewater. There are three types of limiting zones;

  1. A soil layer that contains a water table or redoximorphic features (mottling) providing evidence of a seasonally high water table,
  2. A soil layer or rock that has such slow permeability that the effluent will not be able to penetrate this layer at a rate that will permit the proper treatment of the wastewater, or
  3. A soil layer that does not contain sufficient fines (such as a gravel layer or a layer of shattered rock) to provide contact between the effluent and the soil particles for proper treatment of the effluent.

In Pennsylvania, as the distance between the soil surface and the limiting zone decreases, the number of drainfield options to the homeowner decreases, and the systems become more costly. The minimum depth-to-limiting-zone requirements for various types of soil absorption areas are shown in Table 1.

Table 1. How the depth from soil surface to limiting zone affects the type of absorption system (or drainfield) that may be used. Systems marked with a star (*) require a sand or peat advanced-treatment filter between the treatment tank and the absorption area
Depth between the Soil Surface and the
Limiting Zone (inches)
Absorption Area Required

≥ 60

In Ground Seepage Bed or Trenches

≥ 58

Shallow Placement with Pressure Dosing*

≥ 48

At-Grade System

≥ 20

Elevated Sand Mound

≥ 16 to Rock limiting zone

At-Grade System; Drip System*; Geotextile Sand Filter

≥ 10 to Rock limiting zone

Individual Residential Spray Irrigation System; At-Grade system*; Geotextile Sand Filter

Water movement rate

The second soil evaluation is designed to determine how rapidly the septic-tank effluent will percolate into and through the soil. This is called water movement rate. Depending on the depth to the limiting zone and the type of disposal system chosen, this evaluation may require either (i) a percolation test or "perc test" or (ii) a soil scientist's soil morphologic evaluation.

Percolation test (Perc test)

A percolation (perc) test measures how quickly water moves through the soil. The goal of this test is to ensure that septic effluent infiltrates the ground safely and effectively by assessing how rapidly water moves through the soil on the property during the wettest, worst-case conditions. The percolation rate is the number of minutes it takes for the water level to drop by 1 inch. A percolation rate that is too fast means the water moves through the soil too quickly, which may not allow enough time for effluent treatment before it reaches groundwater. In contrast, a percolation rate that is too slow implies that the soil does not absorb water efficiently and effluent would pond on the surface.

According to 25 Pa. Code § 73.15, percolation tests are done by digging at least 6 vertical test holes (also called post holes) spaced uniformly across the proposed drainfield or absorption area. The holes are often dug to the depth of the proposed absorption area as shown in Figure 2. Each hole is filled with water and left to sit for up to 24 hours to pre-soak, mimicking conditions similar to normal septic system use or rainfall. Before the test, the holes are refilled with additional water. During the test, the SEO or soil consultant measures how quickly the water level falls in the holes.

A cross-section of a perc test hole. The hole is dug to the depth of the proposed drainfield system and is between six to 10 inches in diameter and has two inches of gravel at the bottom.
Figure 2: Typical cross-section of a perc test hole.

Once the site's percolation rate has been determined, this information, along with the depth to the limiting zone, is used to assess the site's suitability for the drainfield. Ideal rates for a conventional drainfield are steady percolation rates, but recommended rates vary by drainfield type.  If the perc rate is faster than 3 minutes per inch or slower than 180 minutes per inch, the site is unsuitable for a conventional drainfield.

Finally, the size of the drainfield is determined by combining the site's percolation rate and the home's maximum expected wastewater flow, based on the number of bedrooms, using a particular formula.   For example, a three-bedroom home may require an absorption area as small as 476 square feet if the percolation rate is 6 minutes per inch. The same three-bedroom home will require an absorption area of up to 1,064 square feet if the percolation rate is 60 minutes per inch. This is to ensure that the constructed drainfield can handle the wastewater volume from the home.

Soil morphological evaluation

For drip irrigation systems and other alternative systems for soil-based disposal sites with limiting zones of less than 20 inches, the perc test is not an approved method for measuring how rapidly effluent will enter and flow through the soil. On these sites, the drainfield size is determined based on the soil's morphological characteristics. This evaluation must be conducted by a Certified Professional Soil Scientist and is conducted in conjunction with the probe evaluation. Three soil characteristics must be determined for the site (taken as the most restrictive conditions found in several probes);

  1. The soil's texture,
  2. The soil's structure shape, and
  3. The degree or grade of the structural development.

Soil scientists have correlated the rate at which water moves through soil with these three soil morphological characteristics. Knowing the soil's texture and the shape and grade of its structure yields two system design-related parameters for each soil, including (a) the infiltration loading rate (ILR) in units of gallons per square foot per day (gal/ft2/d), and (b) the hydraulic linear loading rate (HLLR) in units of gallons per foot per day (gal/ft/d). The ILR indicates how much wastewater can be applied per square foot of drainfield per day, and the HLLR determines how much can be applied along the length of a drainfield. These parameters help system designers ensure that wastewater is evenly distributed and does not overload a particular section of soil.

Summary

The site evaluation is the foundation of the entire septic system. It tells us whether the land can safely treat wastewater, what type of drainfield is needed, and how large it must be. It's about ensuring the septic system reliably protects groundwater from contamination. Even the best-designed drainfield can fail if it is not protected and if the entire septic system is not maintained.  Homeowners can help extend the life of their drainfield by keeping vehicles and heavy equipment off the drainfield, planting only grass over the drainfield, pumping the septic tank regularly, conserving water and directing roof and surface runoff away from the drainfield, and watching what goes down the drain.

References and Resources

 For additional assistance, contact your local Sewage Enforcement Officer or Extension Educator.

 Pennsylvania Association of Sewage Enforcement Officers (PASEO)
PO Box 41
Bethlehem, PA 18016